Blowing cellulose on first floor

Yesterday our insulator, Don Patten and family, came over to finish insulating the house. They stapled up netting and did the first rough blow in roughly 6 hours. They are back today to do the second dense pack blow and top up the attic insulation in areas that settled. This will be the last of the cellulose insulation work. The remaining north and south rim joist areas between the first and second floors will be foamed later this week before the final sheet rocking begins.

In other news, Joe Bates, our friendly local excavator will be installing our septic tank and leach field today.

0 Responses to “Blowing cellulose on first floor”



  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s




Latest Uphill Tweets

  • @ShackValley @AndrewYang Or better, all their largest donors so we can see who’s interest they really represent. 5 days ago
  • RT @robodellaz: More than a year ago, I was asked to do the impossible. Help build an algorithm that could tease out what statehouse bills… 2 weeks ago
  • RT @ShackValley: We receive so many #spam phone calls to our #landline at home we turned off the ringer and answering machine. Cell service… 2 weeks ago
  • RT @harrybr: The name “radio button” comes from the actual physical buttons that were used in old radios. Push one in and the others pop ou… 1 month ago
  • @murtaugh I found the de-aging wierd and distracting. Still loved the movie though! 1 month ago

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 297 other followers


%d bloggers like this: