First floor sheetrock

Last week Warren and crew sheetrocked the main room on the first floor. Before they could do this, gaskets were installed along the exterior walls and furring nailed on the ceiling, same as the second floor. The main objective of the gaskets was to seal the exterior walls from air leakage originating from inside the house.

The only remaining areas to sheetrock are the two small rooms off the main space (pantry and study), the window returns and the 1st floor stair area. Hopefully Howie will begin taping later this week. We’re in a race to finish taping and painting the first floor before the wood floor and kitchen cabinets arrive in 2 weeks.

0 Responses to “First floor sheetrock”



  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




Latest Uphill Tweets

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 270 other followers


%d bloggers like this: