Bathroom floor tile

It was bathroom floor tile weekend. Our stretch goal was to measure, cut and lay all the floor tile. We were able measure and cut all the tile, but only able to lay about 60% of the tiles. We’ll need another couple of nights to finish laying the floor tile and grouting. Jill described the tile and paint selections last month in her post, Interior Painting.

2 Responses to “Bathroom floor tile”


  1. 1 Mary 1-November-2011 at 11:09 pm

    Hi, I’ve been following your blog and asked a Q a while back when you were working on your ERV. I’ll be installing our ventilator in the next two weeks or so and was wondering how you’ve found yours (if you’ve run it yet?).

    How is the noise inside?

    How did the T connections work instead of the wye connections?

    Thanks! (and your house looks great!)

    • 2 Larry 2-November-2011 at 7:14 am

      Hi Mary. With any luck we may commission our ERV and ASHP in a few weeks. I don’t want to run the ERV till the sheetrock taper finishes taping and sanding. That generates a lot of dust that I don’t want in my ERV filters just yet. Unfortunately that may not be soon enough to provide feedback for you, but there’s no reason not to insist that your installer follow best practices and spell it out in the contract. Thanks for reminding me about these issues, I’ll definitely post an update when the systems are commissioned. Thanks and good luck with your house.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s




Latest Uphill Tweets

  • @ShackValley @AndrewYang Or better, all their largest donors so we can see who’s interest they really represent. 1 month ago
  • RT @robodellaz: More than a year ago, I was asked to do the impossible. Help build an algorithm that could tease out what statehouse bills… 1 month ago
  • RT @ShackValley: We receive so many #spam phone calls to our #landline at home we turned off the ringer and answering machine. Cell service… 1 month ago
  • RT @harrybr: The name “radio button” comes from the actual physical buttons that were used in old radios. Push one in and the others pop ou… 2 months ago

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 301 other followers


%d bloggers like this: